Knowledge Base

Intermittency Analysis Project (IAP): Final Report

Intermittency Analysis Project (IAP): Final Report Porter, K. and Intermittency Analysis Project Team (including Davis Power Consultants and PowerWorld Corporation). 2007. Intermittency Analysis Project: Summary of Final Results. California Energy Commission, PIER Research Development & Demonstration Program. CEC-500-2007-081. Workshop Presentation, February 13, 2007.

Tags: ,,

February 13, 2007

Strategic Value Analysis for Integrating Renewable Technologies in Meeting Target Renewable Penetration

Strategic Value Analysis for Integrating Renewable Technologies in Meeting Target Renewable Penetration Davis Power Consultants, PowerWorld Corporation, and Anthony Engineering. June 2005. Supporting Publication for 2005 Integrated Energy Policy Report (IEPR), California Energy Commission, PIER Research Development & Demonstration Program. CEC-500-2005-106. Full 2005 IEPR

Tags: ,

June 1, 2005

Approximate Model of European Interconnected System as a Benchmark System to Study Effects of Cross-Border Trades

Professor Janusz W. Bialek of the University of Edinburgh, UK has developed a European system model in PowerWorld Simulator to benchmark and analyze cross-border trades. The model is referenced in the paper: Q. Zhou, J.W. Bialek; “Approximate Model of European Interconnected System as a Benchmark System to Study Effects of Cross-Border Trades”, IEEE Transactions on Power Systems, Vol. […]

Tags: ,,

May 1, 2005

Visualizing the Electric Grid

T.J. Overbye, J. D. Weber, “Visualizing the Electric Grid,” IEEE Spectrum, February 2001. Published in the Februrary 2001 issue of IEEE Spectrum by Thomas J. Overbye, PhD University of Illinois at Urbana-Champaign by James D. Weber, PhD PowerWorld Corporation This webpage has been developed in conjunction with the article entitled Visualizing the Electric Grid in […]

Tags:

February 1, 2001

Competition Requires Transmission Capacity: The Case of the U.S. Northeast

The following cases were used to generate their respective figures in the July 2000 article in Regulation magazine entitled: “Competition Requires Transmission Capacity:  The Case of the U.S. Northeast”.  All files in the below list are *.zip files containing PowerWorld Binary (*.pwb) and PowerWorld Display (*.pwd) files.  These cases may be viewed using PowerWorld Viewer, which is available here for free download.  […]

Tags: ,,,

July 1, 2000