Time Step Simulation: Loading Input Data

Concept Link IconSee Also

 

The Time Step Simulation allows you to specify the operating conditions of your power system through input data. The input data can be of two types:

Scheduled Data, which is specified for data that more naturally spans multiple time points rather than being defined at each time point. To set up scheduled data see the Setting up Scheduled Input Data section.

Time Point-Based Data is specified for each time point in the Input pages. There are several ways to specify input data: